Aired: 2/4/2012
The new home’s architecture is enhanced with continuity of garage doors, entry doors and shutters as the foundation is covered with natural thin veneer stone.
Aired: 2/11/2012
Dean, Miriam, Dan and Bucky pitch in to install a paver driveway, walkway and step veneer.
Aired: 3/3/2012
Dean, Miriam, and the Hometime crew begin updating the 1970’s remodel of a 1911 kitchen with new windows and a new patio door in the bumpout.
Aired: 3/10/2012
Double hung windows are updated with new inserts as Hometime guts the kitchen and reframes the powder room for a pocket door.
Aired: 3/17/2012
Dean and Miriam finish up rough-ins, insulation, drywall and priming to get ready for new cabinets.
Aired: 3/24/2012
Dean and Miriam show how to blend two different finishes as they install new cabinets.
Aired: 3/31/2012
Dean and Miriam get the kitchen, mud room and powder room areas ready for new flooring and countertops.
Aired: 4/7/2012
It’s time for finishing touches as Dean and Miriam trim out the kitchen, mud room and powder room.
Aired: 4/14/2012
Dean, Miriam and the Hometime crew fire up the fixtures and appliances as they wrap up the project.
Aired: 4/21/2012
Dean and Miriam look at roofing, stone, garage doors and stamped concrete from the curb appeal perspective as a new home is built.
Aired: 4/28/2012
Dean and Miriam talk about roofing, railings and a realistic gas fireplace during the construction of a screen porch.
Aired: 5/5/2012
Dean and Miriam document the construction of two new homes, built inside a home and garden show.
Aired: 5/12/2012
Dean, Miriam and the crew demo some old kitchen countertops and install new quartz surfaces.
Aired: 10/6/2012
Finishing a hilly back yard with landscape steps and tile, a fire ring, plants and sprinklers.
Aired: 10/13/2012
Planting site-appropriate trees after a storm and building a crib for firewood cut and split from the damaged timber.
Aired: 10/20/2012
Pre-building timber frame walls inside and re-building on a new slab near Hometime Log Cabin.
Aired: 10/27/2012
Pre-building timber frame style roof trusses inside and re-assembling those on site as shed construction continues.
Aired: 11/3/2012
Taking out old concrete to repair, reframe and reseal the patio over a storage area.
Aired: 11/10/2012
Re-pouring and re-stamping the concrete patio while fixing up the storage area below.
Aired: 11/17/2012
Resetting an outdoor natural stone island, covering it with granite and setting a new built-in gas grill.
Aired: 11/24/2012
Updating an island kitchen with new cabinets includes visits with the designer and the manufacturer.
Aired: 12/1/2012
Finishing up the new cabinets for the island kitchen and covering those with new countertops.
Aired: 12/8/2012
Installing lights, plumbing fixtures and appliances.
Aired: 12/15/2012
Installing custom carriage house doors and laying a system of tailored pavers.
Aired: 12/22/2012
Installing clay tile roofing and natural stone cladding for the walls.
Aired: 12/29/2012
Finishing up the exterior and getting the new shed ready for winter.