Aired: 2/6/2010
The Hometime crew uses pavers and retaining walls to capture space under a second-story deck.
Aired: 2/13/2010
The Hometime crew frames and insulates curtain walls to enclose the space under a second-story deck.
Aired: 2/20/2010
The Hometime crew finishes the space under a second-story deck to expand a workshop used to create metal sculpture.
Aired: 2/27/2010
The Hometime crew works with surveyors, graders and architects to prepare a building site. Episode one of a thirty part series focusing on this well-designed, state-of-the-art home.
Aired: 3/6/2010
The Hometime crew works with a contractor to excavate for the new house and use poured-in-place insulating concrete forms for the basement walls.
Aired: 3/13/2010
The Hometime crew helps out as the floors and walls of the house are pre-built in a nearby factory and then quickly assembled at the job site on top of the foundation.
Aired: 3/20/2010
The Hometime crew watches as the intricate roof framing components for the house are pre-built off-site, assembled on the ground, and finally hoisted into place.
Aired: 3/27/2010
The Hometime crew supervises the design, construction and installation of the windows for the home, and explains the natural slate roofing system.
Aired: 4/3/2010
The Hometime crew prepares for and supervises the installation of the basement, garage and porch floors.
Aired: 4/10/2010
The Hometime crew manages the installation of the ductwork, recessed lighting, and central vacuum while also helping out with the driveway, stonework and siding.
Aired: 4/17/2010
The Hometime crew installs cables for lighting control, audio, video and security and helps out with several types of insulation.
Aired: 4/24/2010
The Hometime crew helps out installing the radiant floor heating system and the geothermal heating and cooling equipment.
Aired: 9/11/2010
The Hometime crew wraps up a project with a second floor yoga studio for “her” and a garage-level workshop for "him."
Aired: 9/18/2010
After some last-minute preparation crews install four different types of wall board for the interior walls and ceilings.
Aired: 9/25/2010
The project house gets sheathing for the floors, extra-tough primer on the walls, and a stained-cedar vaulted ceiling in three high-profile rooms.
Aired: 10/2/2010
Wooden beams are built outside for the porches. Inside, hardwood trim wainscoting is installed.
Aired: 10/9/2010
The Hometime crews scopes out how the custom matching garage and entry doors are made, and helps out leveling the floors for tiling.
Aired: 10/16/2010
The Hometime crew helps out as craftsmen install ceramic and natural stone tile in the bathrooms, natural stone on the fireplace, and natural stone for the retaining walls.
Aired: 10/23/2010
The Hometime crew installs the paver driveway, as well as the master bathroom cabinets.
Aired: 10/30/2010
The Hometime crew works on the interior doors, kitchen cabinets, wainscoting, and exterior columns.
Aired: 11/6/2010
The Hometime crew installs custom cabinets for the laundry room and starts the home’s wood flooring.
Aired: 11/13/2010
The home office begins to take shape, as the custom staircase work begins.
Aired: 11/20/2010
The stone countertops are fabricated and installed.
Aired: 11/27/2010
The Hometime crew installs cabinets, countertops and landscaping.
Aired: 1/22/2011
The covered porch gets motorized screens, the garage floor gets an epoxy coating, and the last few cabinets are installed.
Aired: 1/29/2011
The custom handrail is built, granite countertops are installed, the drip irrigation is wrapped up, and the yard gets sod.